Change time periods for 30 minutes (renewables-fast)
To test sites, please increase the duration of the procedure periods in the renewables-fast
rectificationPeriod verificationPeriod waitingPeriod signingPeriod admissionPeriod
To test sites, please increase the duration of the procedure periods in the renewables-fast
rectificationPeriod verificationPeriod waitingPeriod signingPeriod admissionPeriod