Check the duration of tenderPeriod in spec subsoil-english
According to technical specification auctionPeriod cant start earlier than 30 c.d. after procedure publishing.
So it should be 2 b.d. (rectificationPeriod) 27 + 1 (perio between states).
For example, in timber-english the duration of tenderPeiod calculated correct.